Customization: | Available |
---|---|
Additional Capabilities: | Food cooking mixing |
After-sales Service: | One-Year Free Warranty and Lifetime Maintenance |
Still deciding? Get samples of US$ 2600/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
model | 100L | 200L | 300L | 400L | 500L | 600L |
Heating source | Natural gas/ liquefied gas. |
Natural gas/ liquefied gas. |
Natural gas/ liquefied gas. |
Natural gas/ liquefied gas. |
Natural gas/ liquefied gas. |
Natural gas / liquefied gas. |
Mixing type | Planetary mixing type | Planetary mixing type | Planetary mixing type | Planetary mixing type | Planetary mixing type | Planetary mixing type |
Discharging way | Manual tilt | Manual tilt | Manual tilt | Manual tilt | Manual tilt | Manual tilt |
Max working temperature | 300ºC | 300ºC | 300ºC | 300ºC | 300ºC | 300ºC |
Reducer power/Hz | 1.5KW | 1.5KW | 1.5KW | 1.5KW | 2.2KW | 2.2KW |
Control blower power /Hz | 250W | 250W | 250W | 250W | 250W | 250W |
Power voltage | 380 V | 380 V | 380 V | 380 V | 380 V | 380 V |
Material | SUS30408 | SUS30408 | SUS30408 | SUS30408 | SUS30408 | SUS30408 |
Size | 1.55m×1.40m×1.55m | 1.80m×1.65m×1.70m | 1.95m×1.65m×1.75m | 1.85m×1.70m×1.85m | 2.05m×1.80m×1.95m | 2.05m×1.80m×1.95m |
Weight | 350kg | 520kg | 640kg | 780kg | 850kg | 880kg |
Operation and use :
1. Check before starting.
1) check whether all the fastening bolts of the body are loose, and the grease is added to each lubricating part according to the filling hole.
2) the motor starts instantly to see if the direction is correct (according to the direction of the arrow).
3) check whether the oil cylinder of hydraulic station is normal.
2. Put the appropriate ingredients into the pot.
1) start stirring motor.
2) open the main gas valve (external takeover, client's own)
3) in the ignition, it is recommended to start the blower before ignition, to prevent detonation and danger.
4) in the process of use, other personnel with no operating experience are strictly prohibited to touch the equipment in case of safety hazards.
3. stop
(1) close the gas valve.
(2) stop the stirring motor and automatically tilt the material.
(3) failure in operation or equipment failure is,
(4) press the emergency stop to avoid the occurrence of damage equipment and bruising personnel.
Production:
a.) Design: All our machines are elaborately designed by our mechanical engineers who are rich of experience in this field. We accept special design according to customer's request.
b.) Processing & Assembling: Parts processing, assembly, testing are based on standard test.
c.) Trial Run: Each machine has to be tested before its deliver
Packing:
It is possible to pack in wooden case or nude pack after wraping by plastic film.
Delivery Time:
Some of our machinery are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time ~35 days depends on your requirement on the product.
Service & Installation:
a.) Consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Debugging of equipment until everything is functional;
d.) Training of equipment maintenance and operating personally;
e.) Provide 1 year complete warranty and life-time maintenance service. and the fittings can be replaced to new using the old one.
f.)Installation and debugging : Seller arranges the engineer to user's factory to install, and help to train 3 operators .After ordering, our company issue drawings and prepared installation, send technicians to the buyer's company for the guide installation and testing on-site, about 3~5 days, the buyer bear the round trip tickets, food and accommodation, and living allowance of $100/day .
let's talk about our ZHUCHENG MBC complete delivery process:
Before each batch of goods is delivery, we will make a comprehensive container arrangement in advance according to the order quantity and the size, volume and gross weight of each of our food machinery, that is, how many units of goods can be loaded in each container, and where each equipment is installed in the container. All of these are carefully calculated. This way, the calculation is accurate. First, when loading, it can be easily loaded quickly and accurately according to the container arrangement diagram. Then, it is designed in advance to make full use of every bit of space in the container to avoid space waste, which can save and control costs for our customers and friends;
Firstly, all the food machinery we have processed and manufactured will be first inspected by our professional technical inspectors. Professional technical inspection engineers conduct all-round inspections, from a small accessory, screws to welding conditions, welds, welding wires, welds, and the operation of the entire set of equipment. They are all tested by professional technical inspection engineers to ensure our commitment to customers of "quality first";
Secondly, after the relevant details of all food machinery such as equipment and spare parts are inspected, we pack the food equipment. There are two main types of packaging: plastic film packaging, which is mainly for equipment shipped directly in full containers. Plastic film packaging can avoid scratches from dust and small objects, and also saves customers packaging costs and the tediousness of disassembling packaging; one is wooden packaging required by export standards, which is mainly for small equipment and large goods that need to be consolidated.
Then, it is our container loading step, which is also a very important part of the delivery procee . First, check the quality of the container to see if there is any damage or loopholes to avoid rain leakage; then, our professional forklift drivers will deliver the equipment to the door of the container one by one, and then our professional loading workers will move the equipment little by little to the innermost end of the container and arrange them in order. Then it is to fix the equipment, which is a critical step. Please watch our video. Every time ZHUCHENG MBC ships, it uses this special container equipment fixing tool, which is very expensive. Each of our equipment will be reinforced in this way to prevent the container from being damaged by bumps during land and sea transportation.
The last step is to seal the container. After ensuring that everything is OK, our ZHUCHENG MBC factory and Technical Inspection Agency have lead seals to safely seal the container.
During the entire loading process, we have professional inspection agencies to inspect and monitor the loading. Professional staff of Shanghai Xiangstar Technical Inspection Agency come to inspect and monitor the loading, and the equipment is affixed with special tapes and lead seals of the inspection agency.
Well, today we want to share with you the whole set of loading processes, I hope it will be helpful to you, and look forward to your cooperation.
One Time Cooperation, Lifelong Forever Service
Warm welcome you to visit our factory and order machines any time With the ideas of ' Quality first, Honesty, Sincerity,Good service', we will provide you with the perfect quality machines and the professional & lifetime services, thank you so much about your sincerely trust and positively support to us ! Thank you ~ !
Every time we meet, there is an unforgettable story ~
The reason why our company is called MBC = Fate, we cherish each fate, cherish the acquaintance with any customer and friends.We will guarantee the perfect quality with lifetime services . Warm welcome to visit us at any time. Looking forward to having a chance to meet & WIN-WIN cooperation together.