|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| After-sales Service: | Lifetime Maintenance |
| Warranty: | 2 years |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

| Model/ | MBC-100L | MBC-200L | MBC-300L | MBC-400L | MBC-500L | MBC-600L |
| Heating source | 320#heat transfer oils |
320#heat transfer oils | 320#heat transfer oils | 320#heat transfer oils | 320#heat transfer oils | 320#heat transfer oils |
| Discharging way | Bottom discharge | Bottom discharge | Bottom discharge | Bottom discharge | Bottom discharge | Bottom discharge |
| working temperature | <300ºC | <300ºC | <300ºC | <300ºC | <300ºC | <300ºC |
| Electric heating pipes power/Hz | 18KW | 24KW | 27KW | 36KW | 48KW | 48KW |
| Motor power | 1.5KW | 1.5KW | 1.5KW | 1.5KW | 2.2KW | 2.2KW |
| Oil consumption | ≈34kg | ≈40kg | ≈50kg | ≈60kg | v80kg | ≈80kg |
| Power voltage | 220 V/60Hz/3f | 220 V/60Hz/3f | 220 V/60Hz/3f | 220 V/60Hz/3f | 220 V/60Hz/3f | 220 V/60Hz/3f |
| Material | SUS30408 | SUS30408 | SUS30408 | SUS30408 | SUS30408 | SUS30408 |
| Size | Ø0.85m×h 1.55m |
Ø0.95m×h 1.55m |
Ø1.05m×h 1.6m |
Ø1.15m×h 1.65m |
Ø1.25m×h 1.7m | Ø1.35m×h 1.75m |
| Weight | ≈140kg | ≈165kg | ≈185kg | ≈205kg | ≈240kg | ≈320kg |
Operation instructions.
1. Check before power on.
Check whether all the fastening bolts of the body are loose, and add the grease to each lubricating part according to the oil filling hole.
2. The motor starts immediately to observe whether the direction is correct (according to the direction of arrow).
3. Check whether the oil cylinder of hydraulic station is normal.
4. Before feeding, inject a small amount of water into the pot, clean the pot and put it into the material.
5, open the heating tube button, button, stir to heat while stirring, in the process of heating, the inlet and exhaust equipment, to ensure that the open state and the external unicom, shall not be artificially hard sealing, prevent the pressure inside the jacket to cause potential safety hazard. The user assumes full responsibility for the serious consequences caused by incorrect operation. Close the heating tube and turn off the stirring motor when the material reaches the required temperature and the scheduled heating time. Turn the handwheel to tilt the pan, unload the material, and finish the work. (the temperature of the heating process can be controlled by the device's temperature controller)
6. In order to keep clean, every use should be cleaned once.
7. Electric heat pipe, reducer, other valves and piping accessories, each class shall have a comprehensive inspection, in case of failure, it shall not run with disease.
8. The electric heat pipe is recommended to be cleaned once in 3-4 months to prevent the stain from affecting the heat transfer efficiency of the electric heat pipe.
9. Heat conduction oil is recommended to be replaced once in 3 months, and too long will affect the heat transfer.




Production:
a.) Design: All our machines are elaborately designed by our mechanical engineers who are rich of experience in this field. We accept special design according to customer's request.
b.) Processing & Assembling: Parts processing, assembly, testing are based on standard test.
c.) Trial Run: Each machine has to be tested before its deliver
Packing:
It is possible to pack in wooden case or nude pack after wraping by plastic film.
Delivery Time:
Some of our machinery are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time ~35 days depends on your requirement on the product.
Service & Installation:
a.) Consultation service before, during, and after sales;
b.) Project planning and design services;
c.) Debugging of equipment until everything is functional;
d.) Training of equipment maintenance and operating personally;
e.) Provide 1 year complete warranty and life-time maintenance service. and the fittings can be replaced to new using the old one.
f.)Installation and debugging : Seller arranges the engineer to user's factory to install, and help to train 3 operators .After ordering, our company issue drawings and prepared installation, send technicians to the buyer's company for the guide installation and testing on-site, about 3~5 days, the buyer bear the round trip tickets, food and accommodation, and living allowance of $100/day . 

One Time Cooperation, Lifelong Forever Service
Warm welcome you to visit our factory and order machines any time With the ideas of ' Quality first, Honesty, Sincerity,Good service', we will provide you with the perfect quality machines and the professional & lifetime services, thank you so much about your sincerely trust and positively support to us ! Thank you ~ !
Every time we meet, there is an unforgettable story ~
The reason why our company is called MBC = Fate, we cherish each fate, cherish the acquaintance with any customer and friends.We will guarantee the perfect quality with lifetime services . Warm welcome to visit us at any time. Looking forward to having a chance to meet & WIN-WIN cooperation together.